Demolition Contractors San Diego › Land Clearing & Site Prep › House & Backyard ADU Pad Grading

House & Backyard ADU Pad Grading in San Diego, CA

Precision cut, fill, moisture conditioning, and laser-checked pad leveling so your foundation contractor receives a flat, properly drained building envelope.

Our local San Diego crew handles expansive san diego clay topsoils, decomposed granite fill, and sub-grade moisture lifts using a dedicated Kubota SVL97-2 track loader with 6-way laser-guided dozer blade and Bomag BMP 8500 trench compactor, working in full alignment with San Diego Municipal Code §142.0103 Grading Regulations & California Residential Code Drainage Slope (2% min). Every project starts with a free site visit and an itemized written estimate so there are zero surprises.

San Diego Equipment & Compliance Spec
Laser-graded 95 percent Proctor compacted residential build pad after demolition

Book a Free San Diego Site Visit

We measure the site, check access, and send a clear written price.

FREE SITE VISIT

🔒 Zero spam. Or call our local San Diego desk directly at (619) 555-0199.

Turnkey Scope Checklist

What Is Included in House & Backyard ADU Pad Grading

Ideal project fit: Backyard ADU builds, custom home lots, and detached garage/shop foundations.

Clear Step-by-Step Workflow

Our 5-Step Demolition Process

STEP 1

1. On-Site Walkthrough & Written Quote.

We inspect access width, utilities, neighbor boundaries, and materials, then send a clear written price.

STEP 2

2. Permits & Utility Clearances.

We align project filings and disconnects with San Diego Municipal Code §142.0103 Grading Regulations & California Residential Code Drainage Slope (2% min).

STEP 3

3. Safe, Dust-Controlled Execution.

Our operators deploy our Kubota SVL97-2 track loader with 6-way laser-guided dozer blade and Bomag BMP 8500 trench compactor with perimeter fencing and water misting.

STEP 4

4. Material Sorting & Recycling.

Clean concrete, metal, and salvageable materials are separated for San Diego C&D recycling facilities.

STEP 5

5. Clean Site Handoff.

We grade or sweep the work zone clean and verify readiness for your builder, inspector, or next phase.

Have questions about permits or utility shut-offs? See our utility disconnect checklist and timeline guide.

Answers Before You Start

House & Backyard ADU Pad Grading FAQs

Pricing depends on square footage, material thickness, equipment access, and hauling tonnage. We visit your San Diego property at no cost and provide an itemized written estimate.

Permit requirements depend on your municipality and structural scope under San Diego Municipal Code §142.0103 Grading Regulations & California Residential Code Drainage Slope (2% min). Our team verifies the exact rule for your parcel and helps with paperwork.

We lay protective mats, fence the work zone, mist active dust, and dismantle inward away from shared property lines before sweeping the street clean.

Yes. Every project starts with a free San Diego site visit and a clear price in writing with zero obligation.

Free On-Site Walkthrough

Book Your Free House & Backyard ADU Pad Grading Site Visit

Tell us about your San Diego project and timeline. We will inspect your site and send a clear written estimate.

Scroll to Top